Week One

So now the van is here it’s time to dive in and start work.

Now the van is here we were itching to get started with some simple jobs. My plan had always been to get the awning fitted first as this would give us 8m2 covered workspace between the van and the house.

First on Friday I had to fit the roof rails, that should have been on the original spec, ready for the awning. The holes are all there just covered by painted over sticky tabs that once scraped off need a smear of Hamerite to cover any residual scratches and the bare metal treatment. No big deal as no one will ever see it.

So on Friday evening I discover that the Fiamma roll out awning installation kit is for LHD/RH Install – fat lot of use that is and thank you Fiamma for telling us. Saturday was remanufacture day a bit of cutting, grinding and welding and now we have a set of LHS brackets. Just waiting for a lift up with the awning next week.

Another simple job were the Aguti swivel bases, the only proper Crafter base the same as Westfalia use. A complete lack of instruction meant lots of deduction but I remembered how I saw the label on them in a Westfalia. The hand brake bracket and trim needed a bit of “adjustment” and I still need to trim the bottom of the drivers seat skirts to properly clear it.

Sue has made a start on the insulation exploring the voids and sticking the first layer to one panel. It’s going to be a very fiddly time consuming.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.